# Eureka Nexus — EKNX Tokenomics

Status:

**PUBLIC FRAMEWORK — MARKET NOT YET ACTIVE**

Network:

**BNB Smart Chain Mainnet**

Chain ID:

`56`

Symbol:

`EKNX`

Decimals:

`18`

---

## Official EKNX contract

`0xF54913A8d5E2AEBD0B62c6411cCf1b5B4aB069c9`

Official contract information should always be verified through:

- https://eurekanexus.pt/contracts.html
- Official Eureka Nexus GitHub
- BscScan

---

# Maximum supply framework

| Allocation | Maximum |
|---|---:|
| Market Reserve | 1,000,000 EKNX |
| Mining / reward capacity | 99,000,000 EKNX |
| Maximum supply | 100,000,000 EKNX |

The maximum EKNX supply framework is:

**100,000,000 EKNX**

---

# Market Reserve

The Market Reserve contains:

**1,000,000 EKNX**

This allocation is intended for the future EKNX market launch architecture.

The Market Reserve is separate from the mining/reward capacity.

Current market status:

**COMING SOON — NOT ACTIVE**

---

# Planned Launch Curve allocation

Current intended architecture:

- Up to **650,000 EKNX** for the Launch Curve
- **350,000 EKNX** reserved for the future DEX / liquidity stage

These are current planning parameters.

They remain subject to final:

- Smart-contract validation
- Security review
- Legal review
- Regulatory review
- Accounting review
- Tax review
- Launch documentation

before activation.

---

# Planned Launch Curve design

The current design intention is to use a continuous progressive pricing curve.

The curve is intended to avoid artificial fixed price steps such as:

- €5
- €10
- €15

Instead, the price is intended to progress continuously according to the final curve formula and market state.

Current pricing model:

**Price is calculated live on-chain by the deployed Genesis bonding curve**

This is a planned launch parameter.

It is not a guarantee of future market value.

The final mathematical formula, slope, limits and on-chain parameters will be published before activation.

---

# Launch Curve objective

The current design objective is to allow the Launch Curve allocation to be progressively distributed through market demand before the planned transition toward a decentralised exchange environment.

The project does not guarantee:

- That all 650,000 EKNX will be purchased
- That the Launch Curve will complete
- That market demand will reach any particular level
- That the future DEX price will be higher than the Launch Curve price

---

# Planned use of Launch Curve proceeds

Current planning framework:

- **70% — liquidity / future DEX market structure**
- **30% — Eureka Nexus development, infrastructure and operations**

The 70% allocation is intended to help support the future liquidity and DEX transition architecture.

The 30% allocation is intended to support areas such as:

- Eureka AI development
- Servers
- Mining infrastructure
- Software development
- Security
- Research
- Operations
- Ecosystem development

This allocation remains subject to final legal, accounting and tax review.

---

# Future DEX reserve

Current intended DEX reserve:

**350,000 EKNX**

This allocation is intended to remain available for the future DEX / liquidity stage.

The final DEX structure has not yet been activated.

Before activation, Eureka Nexus intends to publish:

- Official DEX
- Official trading pair
- Pool address
- Liquidity structure
- Migration conditions
- Verified contract addresses
- Relevant transaction information

---

# Genesis Curve → DEX graduation architecture

Current design direction:

**Launch Curve → liquidity preparation → DEX**

The DEX transition should not occur until the applicable technical, security and legal launch gates have been completed.

See:

`docs/DEX-MIGRATION.md`

---

# Planned payment assets

Because the planned Launch Curve is intended to operate on BNB Smart Chain, payment execution must use assets compatible with that network.

Current planned payment support may include:

- BNB
- USDT on BNB Smart Chain
- USDC on BNB Smart Chain
- Compatible BNB Smart Chain representation of ETH
- Compatible BNB Smart Chain representation of BTC

Exact payment-token contract addresses and routing must be verified before activation.

Users must not send:

- Assets from unsupported networks
- Unsupported token contracts
- Native assets from another blockchain directly to a BSC contract

Official supported payment assets will be published before launch.

---

# Mining / reward capacity

Up to:

**99,000,000 EKNX**

are allocated to the mining and reward architecture.

This must not be interpreted as 99,000,000 EKNX already circulating.

Mining-related EKNX are associated with the official mining/reward mechanism.

---

# Official mining economics

Official Eureka Nexus pool rule:

- Miner — **99%**
- Project fee — **1%**

Current algorithms:

- GPU — `KAWPOW-EUREKA-V1`
- CPU — `RANDOMX-EUREKA-V1`

---

# Automatic payouts

The current Eureka 2026 architecture uses automatic EKNX payouts.

The user does not need to perform a manual on-chain claim through the public Miner.

Current production payout threshold:

**5 EKNX**

Actual payout and mining parameters should always be verified against the current official production network information.

---

# Circulating supply

Maximum supply and circulating supply are not the same concept.

The 100,000,000 EKNX figure represents the maximum framework.

Actual circulating supply depends on:

- Market Reserve distribution
- Mining/reward issuance
- On-chain movements
- Future market activation
- Other legitimate on-chain operations within the project framework

Users should verify on-chain information directly.

---

# Market activation status

Current status:

**NOT ACTIVE**

Before public Launch Curve activation, the project intends to finalise and publish the applicable:

- Final curve formula
- Final curve parameters
- Smart-contract configuration
- Payment-token contracts
- Treasury routing
- Liquidity model
- DEX transition rules
- Market-specific terms
- Risk disclosures
- Legal classification analysis
- MiCA analysis where applicable
- Required white paper where applicable
- Required notification/publication where applicable
- Geographic or eligibility restrictions
- Privacy requirements
- AML/KYC analysis where applicable
- Accounting and tax treatment

---

# No guaranteed value or return

Eureka Nexus does not guarantee:

- Future EKNX price
- Appreciation
- Profit
- Yield
- Income
- Liquidity
- Resale
- Launch Curve completion
- DEX listing
- DEX listing price
- Trading volume
- Investment return

Crypto-assets can be highly volatile and can lose part or all of their market value.

---

# EKNX utility direction

EKNX is intended to form part of the Eureka Nexus ecosystem.

Potential ecosystem uses may include eligible future:

- Eureka AI services
- Subscriptions
- Digital services
- Agent services
- Ecosystem applications
- Mining-related functions
- Other Eureka Nexus products

Future utility does not guarantee market value.

---

# Transparency rule

A feature must not be considered active solely because it is described in this document.

Project documentation uses statuses such as:

- LIVE
- ACTIVE
- COMING SOON
- PLANNED
- IN DEVELOPMENT

Only verified production deployment and official public confirmation define active behaviour.

---

# Related documentation

Launch Curve:

`docs/MARKET-LAUNCH-CURVE.md`

DEX migration:

`docs/DEX-MIGRATION.md`

EKNX overview:

`docs/EKNX.md`

Mining:

`docs/MINING.md`

Smart contracts:

`docs/SMART-CONTRACTS.md`

Risk disclosure:

`EKNX-RISK-DISCLOSURE.md`

Legal launch checklist:

`LEGAL-CHECKLIST.md`

MiCA readiness:

`docs/MICA-READINESS.md`

---

# Project

Eureka Nexus

Portuguese technology project 🇵🇹

Official website:

https://eurekanexus.pt

Official GitHub:

https://github.com/Eureka-Nexus

Official contact:

`official@eurekanexus.pt`

Original project work:

Copyright © 2026 Hélder Costa.
